Project crashing starts with fixed durations, crash limits, and crash costs.
Activity A
Activity A has normal duration 2.
Activity B
Activity B has normal duration 4.
B crash data
B can be shortened by up to 2 days at cost 2 per day.
B crash limit=2
All data
The table pins every normal duration, crash limit, and crash cost before any decision is made.
all crash data is pinned