The snapshot starts by separating planned time from downtime.

highlighted = computed this step

Planned Time

Planned time is 120 minutes.

planned time=120\text{planned time}=120
OEE cycle-time inputsThe deterministic snapshot starts with planned time, downtime, cycle time, and unit counts.OEE cycle-time inputsvalueplanned time120downtime30operating time90ideal cycle2total units45good units40

Downtime

Downtime is 30 minutes.

downtime=30\text{downtime}=30
OEE cycle-time inputsThe deterministic snapshot starts with planned time, downtime, cycle time, and unit counts.OEE cycle-time inputsvalueplanned time120downtime30operating time90ideal cycle2total units45good units40

Operating Time

Operating time is 90 minutes.

12030=90120 - 30 = 90
OEE cycle-time snapshotThe chart recomputes the factors, product, and what-if before drawing.OEE cycle-time snapshotOEE = 3/4 x 3/4 x 8/9 = 1/2planned timedowntime 30operating 90planned 120availability3/4performance3/4quality8/9factornumeratordenominatorvalueavailability901203/4performance901203/4quality40458/9what-if downtime 20; availability 5/6; OEE 5/9deterministic snapshot only