Reduced costs compare every arc cost with the dual prices assigned to its endpoints. Nonnegative reduced costs plus equality of objectives certifies optimality.
highlighted = computed this step
Reduced Costs
The reduced costs are 0, 0, 6, and 0. Motivation: nonnegative reduced costs say no unused reroute can lower cost.
cij−ui−vj≥0
Equality Certificate
The shipment cost and dual objective both equal 11. Interpretation: matching primal and dual values closes the optimality gap.
11=11
Diagram note
Certificate note: tight arcs have zero reduced cost; the one slack arc has positive reduced cost. Pixel positions are rounded for layout; every number shown is exact.