Total time separates setup time from run time before adding them.

highlighted = computed this step

Setup total

Total setup time is 90 minutes.

setup total=90\text{setup total}=90
Setup totalsThe table exposes the recomputed totals and average time.setup totalsvaluerun per batch40time per batch70setup total90run total120total time210units60avg per unit7/2

Run total

Total run time is 120 minutes.

run total=120\text{run total}=120
Setup totalsThe table exposes the recomputed totals and average time.setup totalsvaluerun per batch40time per batch70setup total90run total120total time210units60avg per unit7/2

Total time

Total time is 210 minutes.

90+120=21090 + 120 = 210