The what-if changes setup time and recomputes the exact totals.
Reduced setup
The what-if setup time is 10 minutes per run.
reduced setup=10
Reduced total time
Reduced total time is 150 minutes.
reduced total time=150
Saved time
Saved time is 60 minutes, and the new average is 5/2.
saved time=60average=5/2