A higher master schedule uses the remaining rough-cut capacity.
Higher Schedule
The what-if schedule is 50 units.
what-if schedule=50
What-If Load
The what-if load is 100 hours.
what-if load=100
What-If Capacity Check
The what-if slack is 0 and utilization is 1.
what-if utilization=1