A single demand change can use up the remaining slack.
B Demand What-If
The what-if raises product B demand to 30 units.
what-if B demand=30
What-If Load
The recomputed total load is 150 minutes.
60+90=150
What-If Slack
Utilization becomes 1 and slack becomes 0.
what-if utilization=1what-if slack=0