The order-up-to level covers protection-period demand plus safety stock.
Protection demand
Protection-period demand is 18 units.
protection demand=18
Add safety stock
Add safety stock of 5 units.
safety stock=5
Order-up-to level
The order-up-to level is 23 units.
S=18+5=23