A reconstruction is accepted only when it predicts its measurements. Exact arithmetic here means exact results for the stated model inputs; measured inputs still carry uncertainty and significant-figure limits.
highlighted = computed this step
Reproject the solved grid
Rows return 3 and 7; columns return 4 and 6.
3746
Zero residuals close the reconstruction
All reprojection residuals are 0, so the accepted bit is 1.