Duration Hedging Step by Step

Match the price sensitivity of a bond to the price sensitivity of a hedge: the value of one basis point, the hedge ratio, a test with a shift of yields, the convexity that is left over, and what the test assumes when yields do not move together. Every number is computed in the page.

One Basis Point

What one basis point does to a bond price, and how that grows with the maturity.

  1. The Price of One Basis Point

    how much one basis point moves a bond

  2. Longer Bonds, Larger DV01

    DV01 against maturity, bond by bond

The Hedge

Sell the amount of one bond that cancels the DV01 of another, then test the result with a shift of yields.

  1. The Hedge Ratio

    how much of the second bond cancels the first

  2. Testing the Hedge with a Shift

    reprice bond and hedge after a parallel shift

  3. What the Hedge Leaves: Convexity

    the second-order term the hedge leaves

What a Parallel Shift Assumes

What the test and the hedge assume about how yields move, and how the hedge ratio changes with yields and time.

  1. When Yields Do Not Move Together

    the hedge against moves that are not equal

  2. The Hedge Ratio Drifts

    a hedge that was exact does not stay exact