Duration Hedging Step by Step
Match the price sensitivity of a bond to the price sensitivity of a hedge: the value of one basis point, the hedge ratio, a test with a shift of yields, the convexity that is left over, and what the test assumes when yields do not move together. Every number is computed in the page.
One Basis Point
What one basis point does to a bond price, and how that grows with the maturity.
- The Price of One Basis Point
how much one basis point moves a bond
- Longer Bonds, Larger DV01
DV01 against maturity, bond by bond
The Hedge
Sell the amount of one bond that cancels the DV01 of another, then test the result with a shift of yields.
- The Hedge Ratio
how much of the second bond cancels the first
- Testing the Hedge with a Shift
reprice bond and hedge after a parallel shift
- What the Hedge Leaves: Convexity
the second-order term the hedge leaves
What a Parallel Shift Assumes
What the test and the hedge assume about how yields move, and how the hedge ratio changes with yields and time.
- When Yields Do Not Move Together
the hedge against moves that are not equal
- The Hedge Ratio Drifts
a hedge that was exact does not stay exact